Precision Tapping Built Into Every CNC Program
Tapping cuts internal threads into a machined part, turning a plain drilled hole into a UNC, UNF, metric or NPT connection for a screw, stud or fitting. DEK programs it into the same 3-, 4- and 5-axis CNC milling and CNC turning cycles that make the rest of the part.
Custom tapped holes stay tied to the same datum structure as the surrounding features, with no extra handling step adding tolerance stack-up or lead-time risk. A single prototype and a 5,000-unit run get the same programming and inspection, as part of full CNC machining services.
DEK: Your Custom Tapping Supplier
Tapping is never farmed out at DEK: threads are programmed, machined and inspected in-house alongside every other feature.
Engineer-Reviewed Quotes
An engineer reviews your thread callouts and returns a quote within 6 hours for most parts. Required thread depth is confirmed during drawing review, and validated designs move to production without a re-quote cycle.
CNC Thread Machining Capabilities
Thread standard, hole type, fit class, inspection and lead time each drive a different tapping strategy. Here is how DEK handles them.
Tapped Threads on Milled vs. Turned Parts
Tapping is layered onto whichever process makes the base geometry: milling for prismatic parts, turning for rotationally symmetric parts that need threaded ports.
| Criteria | This ProcessTapping Services | CNC Milling | CNC Turning |
|---|---|---|---|
| Role | Cuts internal threads | Makes base geometry | Makes base geometry |
| Best for | Screws, studs, fittings | Housings, brackets, plates | Shafts, bosses |
| Thread placement | Same datum as the part | Holes on 3-, 4-, 5-axis faces | Axial or radial ports |
| Fit-critical tolerance | ±0.005 mm | ±0.01 mm on 5-axis surfaces | ±0.005 mm shaft-bore fits |
| Extra handling | None, same cycle | Tapping in milling cycle | Tapping in turning cycle |
Industries That Rely on Tapped Parts
Threaded features appear on aerospace cabin and structural parts, medical devices, robotics, semiconductor equipment and automation components.
Tapping Challenges by Material
Thread quality depends on how a material work-hardens, how brittle it is at thin walls and how it reacts to tapping heat.
-
Tapping Aluminum
6061, 6063, 5083 and 5052 are fast-cutting with low tap-breakage risk, common for lightweight aluminum housings.
-
Tapping Stainless Steel
17-4PH and 316LVM work-harden quickly, so stainless gets controlled speed and coolant to avoid galling.
-
Titanium Threads
Ti-6Al-4V has low thermal conductivity that concentrates heat at the cutting edge, so titanium needs slower feeds.
-
PEEK Threads
PEEK is dimensionally stable under load and taps cleanly, without the melt-and-reform issues of softer plastics.
Thread Failures We Prevent
-
Broken Taps in Blind Bores
Chips trapped in a blind bore break taps and tear threads. Controlled chip evacuation and a bottoming tap keep usable depth near the bottom.
-
Galling in Stainless
Stainless work-hardens fast at the tap. Controlled cutting speed and coolant keep the thread clean and the tap intact.
-
Thread Pull-Out in PTFE
Soft PTFE pulls threads out if tapped wrong, so tap geometry and speed are chosen to prevent it.
-
Off-Axis Threads
A tapped hole drifting off datum is a field failure. Cutting it on the part datum and CMM verification keep coaxiality to ±0.005 mm.
ISO Certified Machining for Threads
Every tapped hole is documented under ISO 9001, ISO 13485 and AS9100D, obtained through TUV.
-
AS9100D
Aerospace Quality Management System
-
ISO 9001:2015
Quality Management Standard
-
ISO 13485
Medical Devices Quality Management
How to Order Custom Tapped Parts
Tapping Services FAQ
Cost, thread tolerance, blind holes and lead times for tapped parts.
Request a Tapping Services Quote
Send your drawing with thread callouts and base material. DEK quotes tapping as part of the full machining job, with no separate outsourcing step.
- Engineer-reviewed quote within 6 hours
- UNC, UNF, metric, BSW and NPT threads
- Blind and through holes, 2B or 3B fit
- Prototypes in as fast as 3 days
- No minimum order quantity
