• English

  • French

  • German

  • Italian

  • Portuguese

  • Russian

  • Spanish

Low Volume CNC Machining Services

Low volume CNC machining from 1 to 1,000 units, with no MOQ or tooling costs. Validate with 3-day prototypes, then run the batch under the same certified QMS.

  • 1–1,000

    Units per Run

  • 3 Days

    Prototype Time

  • 98.6%+

    On-Time Delivery

CNC milling cutter machining a steel gear housing in low volume CNC machining
ISO Certified ISO 9001, ISO 13485, AS9100D
Finished low volume CNC machined parts on dark workbench

What Low Volume CNC Machining Means at DEK

Low-volume CNC machining at DEK covers runs from a single prototype unit up to roughly 1,000 pieces, machined without hard tooling or a minimum order quantity.

It fits validation builds, pilot runs and short production bridges before a program scales into higher unit counts. Start with prototype CNC machining in about 3 days, then talk with our team about the full batch.

Small Batch CNC Machining at DEK

A 20-piece order gets the same rigor as a 20,000-piece one. Here is what OEMs, startups and procurement teams count on.

  • No Minimum Order

    Order exactly the quantity your program needs, from one part to a full batch, with no tooling costs or minimum-order penalties.

  • 3-Day Prototypes

    Prototype lead time runs around 3 days, so you validate fit and function before committing to the rest of the run.

  • Certified QMS

    ISO 9001, AS9100D and ISO 13485 certified via TUV: the quality system scales down to small batches without cutting inspection steps.

  • On-Time Delivery

    98.6%+ on-time delivery across 2,300+ global OEM clients: the track record that matters when a small batch still has a hard deadline.

In-House CMM Inspection

Every order gets in-house CMM inspection with full traceability. IQC, IPQC, FAI, OQC, SPC and CAPA stages are documented on every order, not just high-volume contracts.

Low-Volume Capability & Tolerances

Tolerances, processes, materials and lead times for runs of 1 to 1,000 units, all machined without hard tooling.

  • Tolerances for Small-Batch Orders

    Standard low-volume orders hold a general tolerance of ±0.05mm, with tighter bands for fits, profiles and micro parts.

    • General tolerance of ±0.05mm on standard orders
    • Tighter features, fits and profiles to ±0.01mm
    • Micro components under about 10mm to ±0.005mm
    • Parts up to about 1000mm within scope
    Precision Machining
    Parameter Specification
    General tolerance ±0.05mm
    Tight features and fits ±0.01mm
    Micro parts (under ~10mm) ±0.005mm
    Maximum part size About 1000mm
  • Machining Processes for Short Runs

    CAM programming and fixturing are sized to your batch, not a mass-production line, and each part runs on the process its geometry needs.

    Get a Quote
    Parameter Specification
    Programming CAM sized to your batch
    Fixturing Sized to your batch
    Core processes Milling, turning, Swiss-type
    Hardened or complex cavities EDM
    Finishing Anodizing, plating, powder coat
  • Metals and Plastics for Pilot Batches

    DEK machines 50+ metals and engineering plastics for low-volume runs, from common alloys to demanding grades.

    • Titanium for high-strength, low-weight parts
    • Inconel 718 for demanding applications
    • PTFE among engineering plastics
    • Aluminum, brass, steel and tool steel in stock
    View Materials
    Parameter Specification
    Material range 50+ metals and plastics
    Demanding grades Titanium, Inconel 718, PTFE
    Common metals Aluminum, brass, stainless steel
    Common plastics ABS, Delrin, nylon, PEEK
  • Run Sizes and Lead Times

    Batch lead times run longer than the prototype turnaround, so factor them into a launch schedule.

    • Runs from 1 unit up to about 1,000 pieces
    • No MOQ and no tooling investment required
    • Prototypes in around 3 days
    • Batches typically in one to two weeks
    Get a Quote
    Parameter Specification
    Run size 1 to about 1,000 units
    Minimum order None (from 1 part)
    Prototype lead time Around 3 days
    Batch lead time Typically 1 to 2 weeks
    Quote response Typically within 24 hours

Low Volume CNC Machining vs. Other Routes

Choose CNC for functional parts in real engineering materials without tooling lead time. Programs that outgrow 1,000 units move to high volume CNC machining.

Criteria This ProcessLow volume CNC machining SLA 3D printing
Best volume 1 to 1,000 units 1 to 50 units
Tolerance ±0.05mm general, ±0.01mm tight Lower stability than CNC
Part function Functional parts Form-fit checks
Materials Engineering metals, plastics Print resins
Choose when No tooling lead time wanted Checking form before machining

Industries Running Low-Volume Programs

Aerospace, medical devices, robotics and semiconductor equipment teams use DEK for validation builds, revisions and short runs.

Part Sizes and Short-Run Challenges

A single low-volume order can mix micro components, larger structural pieces and features that need EDM.

  • Micro Components

    Parts under roughly 10mm hold ±0.005mm. See our micro machining capability for small parts.

  • Large Structural Parts

    Parts up to about 1000mm are in scope through large part CNC machining.

  • Hardened & Cavity Features

    EDM handles hardened material or complex cavities that cutting tools cannot reach in the batch.

  • Turned & Swiss-Type Parts

    Round and slender parts run on turning or Swiss-type work depending on the geometry.

Common Short-Run Challenges

  • Setup Cost per Part

    Setup and programming spread over a small run raise unit cost; engineers review files for machinability issues before quoting.

  • Mixed-Size Orders

    One order can combine a small bracket with a larger structural piece, up to about 1000mm, under one inspection plan.

  • Iterative Revisions

    No hard tooling means robotics and medical teams can revise hardware between small batches without a tooling write-off.

  • Hard Deadlines

    Small batches still have launch dates: 98.6%+ on-time delivery across 2,300+ OEM clients keeps pilot builds on schedule.

Certified Quality on Every Batch

Small batches run under the same ISO 9001, AS9100D and ISO 13485 quality system as large ones.

  • AS9100D and ISO 9001 certification logo
    AS9100D

    Aerospace Quality Management System

  • ISO 9001 certification logo
    ISO 9001:2015

    Quality Management Standard

  • ISO 13485 certification logo
    ISO 13485

    Medical Devices Quality Management

Our Low-Volume Production Process

  • 1

    Quote & DFM Review

    Engineers check your files for machinability issues before quoting your batch.

  • 2

    Programming & Setup

    CAM programming and fixturing sized to your batch, not a mass-production line.

  • 3

    Machining

    Milling, turning or Swiss-type work by geometry, plus EDM for hardened or cavity features.

  • 4

    Finishing

    Anodizing, plating or powder coating applied to the machined parts per your spec.

  • 5

    CMM Inspection & Ship

    Dimensional checks against your drawing, documents on request, then global dispatch.

Frequently Asked Questions

Cost, minimum order and prototype timing for low-volume runs.

How much does a 20-piece run cost?
It depends on material, part complexity, tolerance and finishing, plus setup and programming time spread across just 20 units. Simple aluminum brackets cost far less per part than tight-tolerance titanium parts needing anodizing. Request a quote for an exact price.
Is there a minimum order quantity?
No. DEK accepts orders as small as one part, so you order exactly the quantity your prototype, pilot run or bridge production needs without paying for unused capacity.
How fast can I get a prototype before committing to a full batch?
Prototype lead time runs around 3 days, letting you validate fit and function before DEK schedules the rest of the batch, which typically takes one to two weeks.

Request a Quote for Your Low-Volume Run

Upload your 2D/3D drawings and engineers review each one directly, typically responding within 24 hours with pricing and lead time.

  • STEP, STP, IGES or PDF files accepted
  • No MOQ: order from a single part
  • No tooling investment to get started
  • Prototypes in around 3 days
  • DFM review before every quote
Request an Aerospace Quote